The trees went from bare to a lush green as the temperatures at the camp rose. The work goes on but is slowly wrapping up. Wiring at the main camp is in, along with lights, ceiling fan, etc., all powered by three 200Watt solar panels and a 5K Watt power inverter. The spring box, once filled with branches and salamanders, is clean and covered. The water pump and 12V battery, though temporarily rigged, has pumped water 600ft to the holding tank at the cabin. The septic tank and leaching field are scheduled to be installed this month. That means electric and plumbing will be nearly complete and the with all the "creature comforts" available, our stays will be more comfortable.
|
This is what it's all about! |
|
The doors were made up to look like barn doors. The results were great.
|
I'm wondering how to best cover the bottom weatherproofing in the front of the cabin. A row a various shrubs should look better. I started with a few of these but will add a different variety as well.
|
305 gallons of water storage, slated to be dug in this month. |
No comments:
Post a Comment